Original content
REPUBLIKA.CO.ID, KARAWANG — Perum Bulog emphasizes that the plan to build 100 new warehouses is still under discussion. The company is being cautious to ensure that the Rp5 trillion project can produce infrastructure that is fully operational when realized. President Director of Perum Bulog, Marga Taufiq, said the company does not want to rush into making a decision before all technical and planning aspects are mature. Currently, Bulog is updating logistics needs data and infrastructure design to ensure effective and targeted construction. "We certainly do not want to make a wrong step. So that when it is built, the infrastructure can be fully operational as much as possible," said Marga when met in Desa Kepuh, Karawang, on Tuesday (11/4/2025). He explained that the discussion of the project is still ongoing at the internal level of Bulog and the relevant ministries. The planning process includes determining the location, capacity, and warehouse operational systems that will ...